Home  /  Horizon  /  Timeline

Timeline

66 milestones · filter by destination, decade and confidence · status Q4 2026

Every row carries a date, a destination, a program, an operator and a confidence tag. Flown events and launch windows are Observed; everything past 2040 is sequence from this analysis, not a schedule.

Milestones
66
Observed
23
Building
21
Projected
5
Modeled
17
Span
2019-2110

The timeline

Space-Industrial Milestones, 2019-2110

Filter by destination, decade and confidence. Dated program events come first; book analysis carries the Modeled tag and a horizon rather than a launch date.

Destination
Decade
Confidence

Showing 66 of 66 milestones

Milestones, status Q4 2026
DateDestinationProgramOperatorEventRated

Rows are drawn from one data array in the page source, ready to move into a database table. Mars launch windows recur every 26 months; see Launch Windows & Cadence.

Reading it

Program Dates Slip; Physics Dates Do Not

Two kinds of date sit in the same table. Mars launch windows are fixed by orbital mechanics and carry the Observed tag. Program dates - Artemis IV, Tianwen-3, the ILRS power station - are announcements, and the record since January 2026 shows how fast they move: Mars Sample Return cancelled, Gateway cancelled, Artemis III turned into a low Earth orbit docking test, New Glenn lost on its pad, Chang'e-7 postponed.

China holds its dates in public and reprices in private; the US reprices in public. The crewed landing before 2030 on Long March 10, Mengzhou and Lanyue has not moved, and Tianwen-3 is now the only funded Mars sample return on the books.

Rows past 2040 come from original analysis, not from any program schedule. They mark the order things have to happen in: lunar water before EML-1 depots, depots before belt cargo, nuclear electric propulsion before any crewed outer-system presence. The order is firmer than the year.

Contested

Deliberately Not Claimed

The load-bearing uncertainties, tagged with the confidence they actually earn.

Building

The 2026-2030 block will be partly wrong by publication. Rows in development move faster than anything else on the site. This page is the place they get corrected.

Modeled

Modeled rows are sequence, not schedule. The lunar mass driver, Arcadia Planitia outpost, Ceres staging and Callisto anchor are placed by what must come first, not by a funded plan.

Modeled

The interstellar dates assume a beam that does not exist. A launch around 2085 at 0.2c needs a 100 GW-class array and a sail with absorptivity below 10-5; neither has been built.

Record

Provenance and Data Sources

Confidence
Observed for flown, fielded or measured - Building for hardware and programs in development - Projected for announced plans - Modeled for original analysis
Status date
Q4 2026
Data
NASA, ESA, JAXA, CNSA and CMSA mission announcements; FCC filings; Rubin Observatory
China
Chang'e-4 to Chang'e-8; Queqiao-2; Tianwen-1 to Tianwen-4; Tiangong; Mengzhou, Lanyue and Long March 10; ILRS with Roscosmos; Three-Body Computing Constellation
Weakest link
Program dates after 2028