Home  /  Players  /  Artemis

Artemis

Program · US-led lunar return · status Q4 2026

Artemis II flew four astronauts around the Moon in April 2026, farther from Earth than anyone had been. Before it launched, NASA had cancelled the SLS upgrades, turned Artemis III into a docking test in low orbit, set aside Gateway and renamed its lunar goal Moon Base. The first crewed landing is now Artemis IV in 2028, on a lander chosen after Artemis III.

Artemis II
1-11 Apr 2026
Distance record
406,771 km
First landing
2028 Artemis IV
Accords
76
FY2027 request
$18.8B -23%
Confidence
Building

Why this program matters

Artemis Was Rebuilt Around Commercial Landers Before Its First Crew Flew

The US-led lunar program routes through Western heavy lift, comms, ISRU and space nuclear.

Artemis II carried Reid Wiseman, Victor Glover, Christina Koch and Jeremy Hansen around the Moon from 1 to 11 April 2026, 406,771 km from Earth - farther than any crew before. The program around it had already been rebuilt. In February NASA cancelled the SLS Block 1B upgrade and the Exploration Upper Stage and turned Artemis III into a 2027 docking test in low orbit. In March, at an event NASA called Ignition, it set aside Gateway and announced Moon Base, a three-phase surface program. In May it renamed three commercial landings as Moon Base Missions. Observed

Jared Isaacman, confirmed as NASA Administrator on 17 December 2025, runs it on two landers - SpaceX's Starship HLS and Blue Origin's Blue Moon MK2 - with the choice for the first landing deferred until after Artemis III. China's crewed landing target is before 2030; see Chinese Program Structure. Building

Missions

The First Crewed Landing Is Now Artemis IV in 2028

Artemis III became a low-orbit docking test with both landers.

Artemis missions · status Q4 2026
MissionDatePlan and statusRated
Artemis II1-11 April 2026Wiseman, Glover, Koch and Hansen (CSA) flew around the Moon; 406,771 km from Earth, a human distance record; direct reentry chosen over skip reentry after Artemis I heat-shield erosionObserved
Artemis IIIMid to late 2027Re-scoped 27 February 2026 to a crewed test in low Earth orbit: Orion docks with both Starship HLS and Blue Moon MK2Building
Artemis IVEarly 2028First crewed landing, two crew to the south pole; lander chosen after Artemis IIIBuilding
Artemis VLate 2028Second landing on Blue Moon ($3.4B contract); first standardized SLS with a Centaur V upper stageProjected

Moon Base

Three Phases, From Robots in 2026 to a Permanent Crew After 2032

Moon Base replaces Gateway as the program's lunar goal.

Moon Base program · status Q4 2026
ElementDateStatusRated
Phase One - robotic foundationNow to 2029Commercial landings, terrain vehicles and survey; program manager Carlos García-GalánBuilding
Phase Two - power, cargo, communications2029-2032Lunar Reactor-1, relay and the JAXA pressurized roverProjected
Phase Three - permanent presence2032 onwardHabitats from Italy and Canada; rotating crewsProjected
Moon Base Missions 1-3Late 2026Blue Moon MK1, Astrobotic Griffin-1 and Intuitive Machines IM-3; MK1 now waits on New Glenn's return to flightBuilding
Lunar Terrain VehiclesBy 2028Astrolab and Lunar Outpost, about $220M each (June 2026)Building
Four more commercial landers2028 onwardAbout $600M awarded 30 June 2026: Peregrine 2 and 3, IM-4, a Blue Ghost variantBuilding
MoonFall drones · Firefly2028$75M subcontract for four propulsive surveyorsProjected
GatewaySet aside March 2026NASA said it is not required; HALO and I-Hab corrosion reported April 2026; hardware being repurposedObserved

Partners and funding

76 Accords Signatories and a Proposed 23% Budget Cut

Europe, Japan and Canada supply hardware; Congress has so far rejected deep cuts.

Partners and funding
Partner or lineFigureRoleRated
Artemis Accords76 signatoriesNewest include Albania, Croatia, Côte d'Ivoire and San Marino (28 September 2026)Observed
ESAService modulesEuropean Service Module through ESM-4 on Artemis V; I-Hab to be repurposedObserved
JAXAPressurized roverLunar Cruiser with Toyota fuel cells, around 2031; two Japanese astronauts to landBuilding
CSACanadarm3 for the surfaceJeremy Hansen flew Artemis II; Canadian habitat planned for Phase ThreeBuilding
NASA FY2026 enacted$24.4BPassed January 2026; Science $7.25BObserved
NASA FY2027 request$18.8BA 23% cut; Science about half, exploration up about 9%; senators of both parties called it inadequateProjected

Contested

Deliberately Not Claimed

The load-bearing uncertainties, tagged with the confidence they actually earn.

Building

Both landers depend on propellant transfer that has not flown. Starship HLS needs a tanker sequence in the high teens; Blue Moon MK2 also refuels. Artemis IV's date rests on demonstrations still unscheduled.

Building

New Glenn's grounding reaches the lunar surface. Blue Moon MK1 and the VIPER delivery both launch on New Glenn, whose pad was damaged in May 2026.

Observed

Gateway's status is reported both ways. NASA said paused; other sources say cancelled with hardware repurposed. The program no longer depends on it either way.

Record

Provenance and Data Sources

Confidence
Observed for flown, fielded or measured - Building for hardware and programs in development - Projected for announced plans - Modeled for original analysis
Status date
Q4 2026
Missions
NASA Artemis II mission record; Artemis restructure (27 February 2026); Artemis III plan (July 2026)
Moon Base
NASA Ignition event (24 March 2026); Moon Base announcement (26-27 May 2026); lander awards (30 June 2026); NASA Moon Base reference page
Budget and partners
FY2026 appropriation (January 2026); FY2027 request (April 2026); NASA Artemis Accords count (28 September 2026)
Weakest link
Cryogenic propellant transfer for both landers