Definition
Launched Mass per Ton Delivered
Gear ratio = launch factor × eΔv / (Isp × g0) ÷ (1 - dry mass fraction).
The exponential is the rocket equation's mass ratio for the corridor. Dividing by one minus the dry mass fraction, 0.10 here, adds tanks and engines. The launch factor, 5.2×, is the site's Earth-to-LEO gear ratio and applies to every route that starts in LEO; routes that start off Earth use 1 and are marked local.
The Δv Corridor Calculator runs the same formula for any route, propulsion class, payload and dry fraction.
By corridor
Gear Ratio by Corridor and Propulsion Class
Every corridor in the index at four specific impulses.
| Corridor | Δv km/s | LOX/CH4, 360 s | LOX/LH2, 450 s | Nuclear thermal, 900 s | Nuclear electric, 3,000 s | Rated |
|---|---|---|---|---|---|---|
| LEO → GEO | 3.90 | 17.4× | 14.0× | 9.0× | 6.6× | Modeled |
| LEO → EML-1 | 3.77 | 16.8× | 13.6× | 8.9× | 6.6× | Modeled |
| LEO → SEL-1 | 3.40 | 15.1× | 12.5× | 8.5× | 6.5× | Modeled |
| LEO → SEL-2 | 3.40 | 15.1× | 12.5× | 8.5× | 6.5× | Modeled |
| LEO → Lunar surface | 5.90 | 30.7× | 22.0× | 11.3× | 7.1× | Modeled |
| Lunar surface → EML-1 (local) | 2.52 | 2.3× | 2.0× | 1.5× | 1.2× | Modeled |
| Lunar surface → Lunar orbit (local) | 1.87 | No propellant | No propellant | No propellant | No propellant | Modeled |
| EML-1 → Mars transfer (local) | 0.77 | 1.4× | 1.3× | 1.2× | 1.1× | Modeled |
| LEO → Mars surface | 4.90 | 23.1× | 17.5× | 10.1× | 6.8× | Modeled |
| Phobos → Mars surface (local) | ~0.9 | 1.4× | 1.4× | 1.2× | 1.1× | Modeled |
| Deimos → Ceres (local) | ~2.9 | 2.5× | 2.1× | 1.5× | 1.2× | Modeled |
| LEO → Ceres | 9.60 | 87.6× | 50.9× | 17.1× | 8.0× | Modeled |
| LEO → Callisto | 11.80 | 163× | 83.8× | 22.0× | 8.6× | Modeled |
| LEO → Titan | 12.60 | 205× | 100× | 24.1× | 8.9× | Modeled |
| LEO → Triton | 16.40 | 601× | 238× | 37.0× | 10.1× | Modeled |
| LEO → Pluto-Charon | 18.20 | 1,001× | 357× | 45.4× | 10.7× | Modeled |
Chemical gear ratios past Mars run into the hundreds and are why every outer-system plan assumes NEP. NEP cannot land; its column applies to in-space legs only. Propulsion detail is on Propulsion Classes.
Reading it
Below 3× Ship It; Above 10× Make It
The bands used by the calculator.
| Gear ratio | Reading | Rated |
|---|---|---|
| Under 3× | Shipping usually wins; local production has to beat a supply chain that already works | Modeled |
| 3-10× | Contested: yield, capital cost and site life decide it | Modeled |
| Over 10× | Making it locally wins even at poor yields | Modeled |
The gear ratio prices launch; it does not decide the mass test for a local plant. Plant and product travel the same corridor, so the gear ratio cancels out of the closure ratio on the Ship-or-Make Threshold. It sets what the plant saves in launch cost once the mass test passes.
China
Chinese Vehicles on the High-Ratio Corridors
The vehicles carrying Chinese payloads up the steepest gear ratios.
| Vehicle | Corridor | Data point | Rated |
|---|---|---|---|
| Long March 5 · CALT | LEO → Lunar surface; LEO → Mars surface | Launched Chang'e-5 (2020) and Tianwen-1 (2020) | Observed |
| Long March 3B · CALT | Earth → Lunar surface | Launched Chang'e-3, Chang'e-4 and Tianwen-2 | Observed |
| Long March 10 · CALT | Earth → Lunar surface, crewed | Two launches per crewed landing: Mengzhou and Lanyue separately | Building |
| Zhuque-3 · LandSpace | Earth → LEO | Stainless-steel, methane-fueled reusable booster | Building |
Contested
Deliberately Not Claimed
The load-bearing uncertainties, tagged with the confidence they actually earn.
The 5.2× launch factor is a site convention. It is carried unchanged so every page agrees. A reusable vehicle's launch factor depends on how much hardware returns, which no single number captures.
NEP ratios use impulsive Δv. A low-thrust spiral out of Earth's gravity well costs about twice the impulsive Δv, so the NEP column understates.
One dry fraction for every vehicle. 0.10 suits a large tank stage; landers and long-coast stages with boil-off control run higher.
Record
Provenance and Data Sources
- Confidence
- Observed for flown, fielded or measured - Building for hardware and programs in development - Projected for announced plans - Modeled for original analysis
- Status date
- Q4 2026
- Method
- Rocket equation, g0 = 9.80665 m/s2; dry mass fraction 0.10; launch factor 5.2×
- China
- CALT Long March 3B, 5 and 10; LandSpace Zhuque-3
- Weakest link
- The NEP column