Space Nuclear

Capability class · fission power, nuclear propulsion, radioisotopes · status Q4 2026

Past the Belt sunlight is too weak to run industry and on Mars it is too unreliable, so fission is the power plant every outer-system and Mars plan assumes. The West has not flown a reactor since 1965. NASA's lunar reactor requirement fell from 100 kWe to 20 kWe in a year, and SR-1 Freedom, launching to Mars in December 2028, is the first flight article on the books.

US reactors flown
1 1965
LR-1 floor
20 kWe draft
SR-1 launch
Dec 2028
HALEU capacity
12 t/yr by 2029
China-Russia reactor
2035
Confidence
Building

Why this class exists

Past the Belt and on Mars, Fission Is the Power Plant

Sunlight falls to 3.7% of Earth's at Jupiter and Martian dust storms cut solar output for weeks; every outer-system and Mars plan assumes a reactor.

The United States has flown one reactor, SNAP-10A, in 1965. The current lunar requirement has moved twice in a year: NASA's August 2025 directive called for 100 kWe on the Moon by 2030, and the August 2026 draft solicitation for Lunar Reactor-1 asks for 20 kWe. The first flight article on the books is SR-1 Freedom, a 20 kWe nuclear-electric pathfinder built on the former Gateway Power and Propulsion Element, launching to Mars in December 2028. Building

The industrial question is specific power - watts per kilogram of reactor, converter and radiator together - because it sets how fast a nuclear-electric ship can reach Ceres or Callisto. The Presence Gate reads it directly: crewed missions to the Belt need a 10-20 MWe ship, three orders of magnitude above anything in this table. Modeled

US fission

The Lunar Requirement Fell From 100 kWe to 20 kWe in a Year

NASA, DOE, the Space Force and the Air Force are each funding small reactors; none has flown.

US fission programs · status Q4 2026
Program · organizationPowerStatusRated
Lunar Reactor-1 (LR-1) · NASA20 kWe minimum (draft)August 2025 directive asked for 100 kWe by 2030; the 30 August 2026 draft SPARC solicitation drops the floor to 20 kWe, five years unattended, through 354-hour lunar nights. No award yetBuilding
SR-1 Freedom · NASA~20 kWe · 48 kW electric propulsionAnnounced March 2026; HALEU heat-pipe reactor with Brayton conversion on the former Gateway Power and Propulsion Element; launches to Mars December 2028 carrying SkyFall with three helicoptersBuilding
DRACO · DARPA, Lockheed Martin, BWXTNuclear thermalCancelled 30 May 2025 after $499M; DARPA cited falling launch costsObserved
Antares R1-S and Mark-1Heat pipe and BraytonMark-0 reached criticality at Idaho National Laboratory 4 June 2026; $161M Space Force award 11 September 2026; ground test 2027Observed
eVinci · Westinghouse5 MWe commercialZero-power criticality at the Nevada National Security Site 24 August 2026Observed
Advanced Nuclear Power for Installations · US Air Force~1 MWeRadiant, Antares and Westinghouse selected April 2026; Radiant unit to Buckley Space Force Base by 2028Building

Radioisotope power

Plutonium-238 Supply Still Sets the Pace of Outer-System Science

Radioisotope generators power probes; americium and strontium are the commercial alternatives.

Radioisotope power
System · organizationOutputStatusRated
Pu-238 production · DOE, Oak Ridge1.5 kg per year goalGoal set for 2026; last confirmed shipment 0.5 kg in June 2023Building
Next-Gen RTG Mod 1 · NASA, DOE~250 WCritical design review April 2026; early-2030s missionsBuilding
Dragonfly MMRTG · NASA, APL~110 WFalcon Heavy no earlier than July 2028; Titan 2034Building
Zeno PowerAm-241 and Sr-90Am-241 supply from Orano (September 2025); NASA lunar radioisotope power systemBuilding
Am-241 heater unit · ESAHeatFirst full-scale core April 2026; first use on Argonaut around 2030Building

Fuel

High-Assay Low-Enriched Uranium Is Scaling in Ohio

HALEU fuels every small reactor on this page, and the Russian supply route closes in 2028.

Fuel supply
ItemFigureStatusRated
HALEU from Centrus, Piketon, Ohio>1,900 kg delivered$900M DOE task order finalized 6 July 2026; first 12 t per year of new capacity by 2029Observed
DOE HALEU allocationsNASA and RadiantConditional commitments 27 July 2026, including fuel for SR-1Observed
Russian uranium import banWaivers end 1 January 2028In force since 11 August 2024; Russia restricted exports to the US in November 2024Observed

China and others

China and Russia Plan a Lunar Reactor for 2035

The ILRS reactor is the reason the August 2025 US directive gave for its urgency.

China, Russia and Europe
ProgramScaleStatusRated
ILRS lunar nuclear power station · CNSA and RoscosmosSurface reactorAgreement May 2025; delivery 2035, completion around 2036Projected
Chang'e-3 radioisotope units · CNSAHeat and powerFlew 2013Observed
Vehicle-mounted microreactor · FDS consortium, China10 MWeTested 30 April 2026; space named as one applicationObserved
TEM / Zeus nuclear tug · Roscosmos1 MWeOrbital test no earlier than 2030Projected
Lunar micro-reactor · Rolls-Royce, UK100 kW goalPut on indefinite hold February 2026Observed

Contested

Deliberately Not Claimed

The load-bearing uncertainties, tagged with the confidence they actually earn.

Building

No space reactor has flown from the West since 1965. Every power figure for Mars, the Belt and the outer system assumes a reactor class that exists only in ground tests.

Projected

Launch approval is regulatory. Reactor launches go through the NSPM-20 authorization process. A tightened regime would delay every program above without any technical failure.

Modeled

Megawatt-class propulsion is the gate for crewed missions past Mars. SR-1 at 20 kWe is a pathfinder. The ships that would move the Belt and Callisto across the Presence Gate are 500-1,000 times larger.

Record

Provenance and Data Sources

Confidence
Observed for flown, fielded or measured - Building for hardware and programs in development - Projected for announced plans - Modeled for original analysis
Status date
Q4 2026
NASA
Fission surface power directive (4 August 2025); SR-1 Freedom announcement (March 2026); draft SPARC solicitation (30 August 2026)
Industry and defense
DARPA DRACO cancellation (30 May 2025); Antares criticality (4 June 2026) and Space Force award (11 September 2026); Westinghouse eVinci criticality (24 August 2026)
Fuel
DOE Centrus task order (6 July 2026); DOE HALEU allocations (27 July 2026); Prohibiting Russian Uranium Imports Act
China and Russia
CNSA-Roscosmos lunar power station agreement (May 2025); FDS microreactor test (30 April 2026)
Weakest link
Specific power of flight reactors is unmeasured