Orbital Compute

Capability class · AI data centers in orbit · status Q4 2026

Orbital compute moves AI data centers to continuous sunlight and a deep-space heat sink, and pays in launched kilograms. SpaceX filed for up to 1 million AI1 satellites and calls the business unproven in its own S-1; China already flies 12 laser-linked computing satellites. Radiator area, not chips, sizes every design.

Largest filing
1,000,000 satellites
AI1 power
175/250 kW avg/peak
AI1 radiator
160 m²
Computing sats flown
12+ China
Commercial service
0
Confidence
Building

Why this class exists

Orbit Trades Grid Power for Launched Kilograms

AI data centers are short of power, cooling and permits on the ground; in a dawn-dusk orbit they have continuous sunlight and deep space as a heat sink.

The case for orbital compute is power without a grid connection and cooling without water. The price is mass: every watt needs solar array to make it and radiator to throw it away, and a radiator's output depends only on its own temperature. SpaceX's AI1 design rejects about 1.4 kW per square meter and reaches about 70 kW of compute per tonne. At that ratio the whole business is a bet on launch cost, which is why it appears on the Heavy Lift edge list. Projected

Flight hardware exists and is small. China's Three-Body constellation has flown 12 laser-linked computing satellites since May 2025. Starcloud flew one NVIDIA H100 in November 2025, and Google's first Suncatcher satellite launched on 1 October 2026. SpaceX merged with xAI in February 2026, filed for up to 1 million satellites, and told investors in its S-1 that orbital data centers may not achieve commercial viability. One industry estimate puts orbital compute at about three times terrestrial cost per watt. Building

Western programs

SpaceX Filed for a Million Satellites; Starcloud and Google Are Flying First

Prototypes in 2025-2027, constellations promised after Starship cadence arrives.

Western orbital compute programs · status Q4 2026
Program · companyScaleStatusRated
Starmind · SpaceX (with xAI)Up to 1,000,000 satellites filedFCC filing January 2026 for 500-2,000 km shells; prototypes due early 2027; Gigasat factory in Bastrop County, Texas. The S-1 warns the business may not be commercially viableBuilding
Starcloud-1 · Starcloud60 kg · 1 NVIDIA H100Launched 2 November 2025; trained NanoGPT and ran Gemma in orbit in December 2025Observed
Starcloud-2 · StarcloudBlackwell GPU · large deployable radiatorDue October 2026; Starcloud has filed for up to 88,000 satellites and raised $250M at $2.3B in August 2026Building
Project Suncatcher M1 · Google with Planet4 Trillium TPUs · ~1 kWLaunched 1 October 2026 on Transporter-18; contact confirmed, no radiation data released yetObserved
Orbital data center nodes · Axiom2 nodesReached orbit 11 January 2026 aboard Kepler optical relay satellites; ISS node due 2027Observed
Galactic Brain · AetherfluxFirst nodeAnnounced December 2025; first node targeted Q1 2027Projected
TeraWave · Blue Origin~5,400 satellitesData-center networking constellation filed January 2026Projected
StarVault · LonestarData storageFirst payload on Sidus LizzieSat-4, autumn 2026Projected

Chinese programs

China Has the Only Laser-Linked Computing Constellation in Orbit

ADA Space, Zhejiang Lab, Guoxing Aerospace and CASC are each building toward thousands of computing satellites.

Chinese orbital compute programs · status Q4 2026
Program · operatorScaleStatusRated
Three-Body Computing Constellation · ADA Space and Zhejiang Lab12 satellites · ~5 POPSLaunched May 2025: up to 744 TOPS each, 30 TB storage, 100 Gbps laser links held eight days at 99.99%; 100 satellites targeted by 2027Observed
Star Computing · Guoxing Aerospace2,800 by 2030 targetedRan the Qwen3 model in orbit in January 2026Observed
Chenguang-1 · Orbital ChenguangTechnology testLaunched 24 July 2026 on Lijian-1 toward a gigawatt-class orbital data centerObserved
CASC space computingGigawatt scalePlanned within the 15th Five-Year Plan; Chinese ITU filings total about 200,000 satellitesProjected

Design figures

Radiator Area, Not Chips, Sizes Every Design

Published figures for the designs that matter.

Published design figures
DesignPowerThermal and massRated
AI1 · SpaceX250 kW peak · 175 kW average160 m² radiator at ~1.4 kW/m² 70 m wingspan; one NVIDIA Vera Rubin NVL72 rack; ~70 kW per tonneProjected
Starcloud-3200 kW3 t, sized for Starship; viable at $500 per kg launchProjected
Suncatcher cluster · Google81 satellites1 km radius at 650 km; economics assume $200 per kg launch around 2035Projected
Three-Body satellite744 TOPSFlight hardware; laser-linkedObserved

No flown GPU or TPU has published single-event-upset data yet. Commercial accelerators are flying unhardened, and the radiation record from Starcloud-1, Suncatcher M1 and the Three-Body satellites will decide how much shielding mass every later design carries.

Where it appears

Orbital Compute Sits on Top of Launch, Relay and Chips

Every edge is a dependency the business cannot control.

Dependency edges
Depends onRelationshipBreaks ifRated
Heavy Lift · StarshipArray, radiator and rack mass to orbitLaunch cost stops falling below ~$500 per kgBuilding
Comms & PNTStarlink and laser backbones carry workloads to the groundGround-station or spectrum limitsObserved
Terafab · Tesla, SpaceX, IntelChip supply for Starmind; Grimes County, TexasThe framework agreement stays non-bindingProjected
The MoonRadiator and array area as a lunar exportEarth-launched area stays cheaperModeled

Contested

Deliberately Not Claimed

The load-bearing uncertainties, tagged with the confidence they actually earn.

Observed

The largest player calls the business unproven. SpaceX's S-1 risk section says orbital data centers may not achieve commercial viability. Filings for a million satellites are spectrum claims, not production plans.

Building

Radiation tolerance of commercial accelerators is unmeasured in orbit. The first data returns from 2026 flights will move every power-per-tonne figure on this page.

Projected

Cost parity depends on launch near $200-500 per kg. Google's own model assumes $200 per kg around 2035. Falcon 9 lists near $4,250 today.

Record

Provenance and Data Sources

Confidence
Observed for flown, fielded or measured - Building for hardware and programs in development - Projected for announced plans - Modeled for original analysis
Status date
Q4 2026
SpaceX
FCC filing for up to 1,000,000 satellites (January 2026); SpaceX-xAI merger (2 February 2026); S-1 (April 2026); AI1 design release (June 2026)
Others
Starcloud flight and funding announcements; Google Suncatcher M1 launch (1 October 2026); Axiom node launch (11 January 2026); Aetherflux; Blue Origin TeraWave filing
China
Zhejiang Lab and ADA Space Three-Body releases; Guoxing Aerospace; Orbital Chenguang launch (24 July 2026)
Weakest link
No published radiation data for flown commercial accelerators; launch cost assumptions