Home  /  Corridors  /  Corridor Detail

Corridor Detail

9 pages for 10 corridors · status Q4 2026

Each corridor with hardware behind it gets a page with the same sections: the route by leg, who has flown it, who flies it next, the gear ratio and the window. The modeled corridors past Mars point to their destination hubs until nuclear electric propulsion flies.

Corridors
16
Detail pages
9
Built
3
To build
6
Destination hubs
6
Template
One

Which corridors get a page

A Page for Every Corridor With Hardware Behind It

A corridor gets its own detail page when something has flown it, or a program or architecture depends on it. That is 10 of the 16 corridors in the Corridor Index.

The 6 modeled corridors past Mars rest on one Δv figure and transit times that assume nuclear electric propulsion nobody has flown. Until that changes, they point to their destination hubs, which already carry everything known about them.

LEO → SEL-1 and LEO → SEL-2 share one page: the same Δv, transit and light time, with different spacecraft at each end.

The pages

Corridor Detail Pages

3 built, 6 to build, 6 covered by destination hubs.

Detail pages by corridor
CorridorStatusDetail pageRated
LEO → GEOFlownTo buildObserved
LEO → EML-1FlownTo buildObserved
LEO → SEL-1FlownBuiltObserved
LEO → SEL-2FlownBuiltObserved
LEO → Lunar surfaceFlownBuiltObserved
Lunar surface → EML-1PlannedTo buildBuilding
Lunar surface → Lunar orbitAssumedTo buildProjected
EML-1 → Mars transferPlannedTo buildBuilding
LEO → Mars surfaceFlownBuiltObserved
Phobos → Mars surfaceAssumedTo buildProjected
Deimos → CeresModeledDestination hub: The Asteroid BeltModeled
LEO → CeresModeledDestination hub: The Asteroid BeltModeled
LEO → CallistoModeledDestination hub: Jovian SystemModeled
LEO → TitanModeledDestination hub: Saturnian SystemModeled
LEO → TritonModeledDestination hub: Neptune SystemModeled
LEO → Pluto-CharonModeledDestination hub: Pluto & the EdgeModeled

The template

Every Detail Page Carries the Same Sections

Built as one template so each page can later be served from one database table.

Sections of a corridor detail page
SectionHoldsRated
Corridor recordFrom, to, Δv, transit, gear ratio, window, light time, carries, status, retiredModeled
Δv budgetThe route by leg, with the vehicle that flew each burnModeled
Who has flown itThe firsts, then totals by program; detail stays on the destination hubModeled
Who flies it nextVehicles and missions in developmentModeled
Gear ratioBy propulsion class, from the same formula as the calculatorModeled
Time and windowsTransit, launch cadence and light timeModeled
China, Contested, RecordThe same closing sections as every reference pageModeled

Record

Provenance and Data Sources

Confidence
Observed for flown, fielded or measured - Building for hardware and programs in development - Projected for announced plans - Modeled for original analysis. Rows here carry each corridor's own rating
Status date
Q4 2026