Corridor record
The Fields Every Corridor Carries
The same fields open every corridor detail page.
- From
- LEO
- To
- Mars surface
- Δv
- 4.90 km/s, with aerobraking
- Transit
- 6-9 months; 8.5 months on a minimum-energy transfer
- Gear ratio
- 23.1× on LOX/methane, from Earth's surface
- Window
- Every 26 months
- Light time
- 3-22 min one way
- Carries
- Landers and rovers; later cargo, crew and propellant plants
- Status
- Flown
- Retired
- No
- Rated
- Observed
Δv budget
The Atmosphere Does Most of the Braking
Departure from LEO is fixed; arrival depends on how much the atmosphere removes.
| Leg | Δv | Flown by | Rated |
|---|---|---|---|
| LEO → trans-Mars injection | 3.6 km/s | Centaur upper stage on Perseverance; Long March 5 upper stage on Tianwen-1 | Observed |
| Midcourse corrections | About 0.1 km/s | Every Mars lander | Observed |
| Entry, descent and landing, propulsive share | About 1.2 km/s | Viking retro-rockets; Curiosity sky crane; Starship landing burn | Modeled |
| Total | 4.90 km/s | The atmosphere removes most of the 5.5-7.5 km/s arrival speed for free | Modeled |
The return is the hard leg. Ascent from the surface to low Mars orbit costs about 4.1 km/s and trans-Earth injection about 2.1 km/s more, with no atmosphere to help. No vehicle has yet lifted off Mars; Tianwen-3's ascent vehicle would be the first. That is why propellant made on Mars matters - see Mars.
Who has flown it
10 Successful Landings by Two Agencies Since 1976
The firsts, then the totals by program. Landing sites and findings are on Mars.
| Mission | Operator | Year | First | Rated |
|---|---|---|---|---|
| Mars 3 | USSR | 1971 | First soft landing; transmitted for about 20 seconds | Observed |
| Viking 1 | NASA | 1976 | First working lander; six years on the surface | Observed |
| Mars Pathfinder | NASA | 1997 | First rover, Sojourner; airbag landing | Observed |
| Phoenix | NASA | 2008 | First polar landing; touched water ice | Observed |
| Curiosity | NASA | 2012 | First sky-crane landing; 899 kg rover | Observed |
| Perseverance | NASA | 2021 | Heaviest landed rover, 1,025 kg; Ingenuity helicopter; MOXIE made oxygen | Observed |
| Tianwen-1 | CNSA | 2021 | First Chinese landing, Zhurong rover; orbiter, lander and rover in one launch | Observed |
| Program | Landings | Years | Landers | Rated |
|---|---|---|---|---|
| NASA | 9 | 1976-2021 | Viking 1 and 2, Pathfinder, Spirit, Opportunity, Phoenix, Curiosity, InSight, Perseverance | Observed |
| CNSA | 1 | 2021 | Tianwen-1 and Zhurong, Utopia Planitia | Observed |
| USSR | 1, partial | 1971 | Mars 3; contact lost within a minute | Observed |
Failed attempts left out of the totals include Mars Polar Lander (NASA, 1999), Beagle 2 (ESA and UK, 2003; landed but never deployed) and Schiaparelli (ESA, 2016).
Who flies it next
Two Sample Missions in 2028, Then Starship
China's Tianwen-3 and ESA's Rosalind Franklin share the 2028 window.
| Mission | Operator | Role | Rated |
|---|---|---|---|
| Tianwen-3 | CNSA | Sample return; two Long March 5 launches in the 2028 window | Building |
| ExoMars Rosalind Franklin | ESA, with NASA | Drilling rover; launch in the 2028 window | Building |
| Starship | SpaceX | Uncrewed cargo landings ahead of crew; no window committed here | Projected |
Gear ratio
Every Ton on the Surface Costs About 23.1 Tons Launched
Rocket equation for 4.90 km/s from LEO, dry mass fraction 0.10, times the 5.2× Earth-to-LEO launch factor.
| Propulsion | Isp | Mass ratio | Gear ratio | Rated |
|---|---|---|---|---|
| Storable, MMH/NTO | 320 s | 4.77 | 27.5× | Observed |
| Methane, LOX/CH4 | 360 s | 4.01 | 23.1× | Observed |
| Hydrogen, LOX/LH2 | 450 s | 3.04 | 17.5× | Observed |
| Nuclear thermal to Mars, methane to land | 900 s, 360 s | 2.14 | 12.3× | Modeled |
Mars costs less per ton landed than the Moon, 23× against 31×, because its atmosphere replaces most of the landing burn. The trade is the 26-month window and the months in transit, which Ship-or-Make Threshold counts as schedule.
Time and windows
One Window Every 26 Months
Perseverance and Tianwen-1 both took about 203 days in 2020-2021.
The next windows open in late 2026, at the turn of 2028 and 2029, and in early 2031. Faster transits are possible with more Δv, but the window spacing does not change - see Launch Windows & Cadence.
Entry, descent and landing take about seven minutes against a 3-22 minute one-way light time, so every Mars landing has been fully autonomous.
China
China Landed on Its First Attempt
Tianwen-1 put an orbiter, lander and rover in place with one Long March 5 launch.
| Program | Data point | Rated |
|---|---|---|
| Tianwen-1 · CNSA | Orbiter, lander and Zhurong rover; launched July 2020 on Long March 5, landed May 2021 | Observed |
| Tianwen-3 · CNSA | Lander, ascent vehicle and return orbiter; samples back around 2031 | Building |
| Mars base planning · CNSA | Crewed missions discussed for the 2030s; no vehicle committed | Projected |
Contested
Deliberately Not Claimed
The load-bearing uncertainties, tagged with the confidence they actually earn.
Heavy landing is undemonstrated. The heaviest rover landed is Perseverance at 1,025 kg. A Starship-class lander puts about 100 tons down, a 100-fold step; supersonic retropropulsion has been tested only by Falcon 9 boosters in Earth's upper atmosphere.
The 4.90 km/s assumes aerobraking. How much the atmosphere removes depends on vehicle shape and mass; a heavy lander spends more propellant than the small landers that set the record.
Record
Provenance and Data Sources
- Confidence
- Observed for flown, fielded or measured - Building for hardware and programs in development - Projected for announced plans - Modeled for original analysis
- Status date
- Q4 2026
- Mission data
- NASA Viking, Pathfinder, Phoenix, Curiosity, InSight and Perseverance; USSR Mars 3; CNSA Tianwen-1; ESA Schiaparelli; MOXIE results
- China
- CNSA Tianwen-1 and Tianwen-3
- Weakest link
- Entry, descent and landing for 100-ton vehicles