Home  /  Corridors  /  Corridor Detail  /  LEO → Mars Surface

LEO → Mars Surface

Corridor detail · status Q4 2026

4.90 km/s from low Earth orbit to the Mars surface, because the atmosphere does most of the braking. Ten landers have made it since Viking 1 in 1976, nine American and one Chinese; nothing has yet flown the return.

Δv
4.90 km/s
Transit
6-9 mo
Gear ratio
23.1×
Window
26 mo
Landings
10
Status
Flown

Corridor record

The Fields Every Corridor Carries

The same fields open every corridor detail page.

From
LEO
To
Mars surface
Δv
4.90 km/s, with aerobraking
Transit
6-9 months; 8.5 months on a minimum-energy transfer
Gear ratio
23.1× on LOX/methane, from Earth's surface
Window
Every 26 months
Light time
3-22 min one way
Carries
Landers and rovers; later cargo, crew and propellant plants
Status
Flown
Retired
No
Rated
Observed

Δv budget

The Atmosphere Does Most of the Braking

Departure from LEO is fixed; arrival depends on how much the atmosphere removes.

Δv by leg
LegΔvFlown byRated
LEO → trans-Mars injection3.6 km/sCentaur upper stage on Perseverance; Long March 5 upper stage on Tianwen-1Observed
Midcourse correctionsAbout 0.1 km/sEvery Mars landerObserved
Entry, descent and landing, propulsive shareAbout 1.2 km/sViking retro-rockets; Curiosity sky crane; Starship landing burnModeled
Total4.90 km/sThe atmosphere removes most of the 5.5-7.5 km/s arrival speed for freeModeled

The return is the hard leg. Ascent from the surface to low Mars orbit costs about 4.1 km/s and trans-Earth injection about 2.1 km/s more, with no atmosphere to help. No vehicle has yet lifted off Mars; Tianwen-3's ascent vehicle would be the first. That is why propellant made on Mars matters - see Mars.

Who has flown it

10 Successful Landings by Two Agencies Since 1976

The firsts, then the totals by program. Landing sites and findings are on Mars.

Firsts on the LEO → Mars surface corridor
MissionOperatorYearFirstRated
Mars 3USSR1971First soft landing; transmitted for about 20 secondsObserved
Viking 1NASA1976First working lander; six years on the surfaceObserved
Mars PathfinderNASA1997First rover, Sojourner; airbag landingObserved
PhoenixNASA2008First polar landing; touched water iceObserved
CuriosityNASA2012First sky-crane landing; 899 kg roverObserved
PerseveranceNASA2021Heaviest landed rover, 1,025 kg; Ingenuity helicopter; MOXIE made oxygenObserved
Tianwen-1CNSA2021First Chinese landing, Zhurong rover; orbiter, lander and rover in one launchObserved
Successful landings by program
ProgramLandingsYearsLandersRated
NASA91976-2021Viking 1 and 2, Pathfinder, Spirit, Opportunity, Phoenix, Curiosity, InSight, PerseveranceObserved
CNSA12021Tianwen-1 and Zhurong, Utopia PlanitiaObserved
USSR1, partial1971Mars 3; contact lost within a minuteObserved

Failed attempts left out of the totals include Mars Polar Lander (NASA, 1999), Beagle 2 (ESA and UK, 2003; landed but never deployed) and Schiaparelli (ESA, 2016).

Who flies it next

Two Sample Missions in 2028, Then Starship

China's Tianwen-3 and ESA's Rosalind Franklin share the 2028 window.

Vehicles in development
MissionOperatorRoleRated
Tianwen-3CNSASample return; two Long March 5 launches in the 2028 windowBuilding
ExoMars Rosalind FranklinESA, with NASADrilling rover; launch in the 2028 windowBuilding
StarshipSpaceXUncrewed cargo landings ahead of crew; no window committed hereProjected

Gear ratio

Every Ton on the Surface Costs About 23.1 Tons Launched

Rocket equation for 4.90 km/s from LEO, dry mass fraction 0.10, times the 5.2× Earth-to-LEO launch factor.

Gear ratio by propulsion class
PropulsionIspMass ratioGear ratioRated
Storable, MMH/NTO320 s4.7727.5×Observed
Methane, LOX/CH4360 s4.0123.1×Observed
Hydrogen, LOX/LH2450 s3.0417.5×Observed
Nuclear thermal to Mars, methane to land900 s, 360 s2.1412.3×Modeled

Mars costs less per ton landed than the Moon, 23× against 31×, because its atmosphere replaces most of the landing burn. The trade is the 26-month window and the months in transit, which Ship-or-Make Threshold counts as schedule.

Time and windows

One Window Every 26 Months

Perseverance and Tianwen-1 both took about 203 days in 2020-2021.

The next windows open in late 2026, at the turn of 2028 and 2029, and in early 2031. Faster transits are possible with more Δv, but the window spacing does not change - see Launch Windows & Cadence.

Entry, descent and landing take about seven minutes against a 3-22 minute one-way light time, so every Mars landing has been fully autonomous.

China

China Landed on Its First Attempt

Tianwen-1 put an orbiter, lander and rover in place with one Long March 5 launch.

Chinese programs on this corridor
ProgramData pointRated
Tianwen-1 · CNSAOrbiter, lander and Zhurong rover; launched July 2020 on Long March 5, landed May 2021Observed
Tianwen-3 · CNSALander, ascent vehicle and return orbiter; samples back around 2031Building
Mars base planning · CNSACrewed missions discussed for the 2030s; no vehicle committedProjected

Contested

Deliberately Not Claimed

The load-bearing uncertainties, tagged with the confidence they actually earn.

Modeled

Heavy landing is undemonstrated. The heaviest rover landed is Perseverance at 1,025 kg. A Starship-class lander puts about 100 tons down, a 100-fold step; supersonic retropropulsion has been tested only by Falcon 9 boosters in Earth's upper atmosphere.

Modeled

The 4.90 km/s assumes aerobraking. How much the atmosphere removes depends on vehicle shape and mass; a heavy lander spends more propellant than the small landers that set the record.

Record

Provenance and Data Sources

Confidence
Observed for flown, fielded or measured - Building for hardware and programs in development - Projected for announced plans - Modeled for original analysis
Status date
Q4 2026
Mission data
NASA Viking, Pathfinder, Phoenix, Curiosity, InSight and Perseverance; USSR Mars 3; CNSA Tianwen-1; ESA Schiaparelli; MOXIE results
China
CNSA Tianwen-1 and Tianwen-3
Weakest link
Entry, descent and landing for 100-ton vehicles